Favicon 4 WebP

Anti-Terrorist Bollards project

Anti-1
Selected as the preferred supplier to install Anti-Terrorist Bollards outside of Burnley Football Club. The new bollards will protect matchday fans from potential incidents. This project is in conjunction with the Town 2 Turf project also undertaken by Groundwork Direct.

This work forms part of the £6.1 million Town2Turf project to improve pedestrian links between the stadium area and Burnley town centre.
 
Measures are being included in the Town2Turf scheme to help ensure the safety of members of the public on match days. Hydraulic bollards will be installed in the carriageway at both ends of Harry Potts Way.
 
They will be flush to the road surface and only raised on match days when Harry Potts Way is closed to traffic.
 
Permanent bollards will be installed in the footways at the same points and will be designed to provide enough space for wheelchairs users and people with pushchairs etcetera to get through.
 
BURNLEY will be the first football club in the country to install security barriers to protect fans from potential terrorist attacks.
 
The temporary barriers, which were first used outside Turf Moor for Burnley’s 2-0 win over Swansea, prevent drivers from ramming vehicles into supporters making their way to the ground.
 
These barriers are in place to halt any vehicles from entering Harry Potts Way [which runs alongside Turf Moor] and protect pedestrians as they make their way into and out of the stadium.
 
Cyclists and wheelchair users can pass through the barriers, which can be dropped in under 30 seconds to enable access for the emergency services.

Latest Projects

PHOTO-2025-08-28-15-33-15-1
Lancashire Verge Works
We are proud to announce that we have been awarded the verge works contract with Lancashire County Council (LCC).
Photo-8-2
Clitheroe Castle Improvements
We are pleased to announce that Groundwork Direct has been officially awarded the contract for the Clitheroe Castle Improvements Project.

Past Projects

Clitheroe-Market.jpeg
Improvements to Clitheroe Market
Following a tender process completed by Ribble Valley Borough Council, Groundwork Direct Limited are pleased to have been successfully selected to complete Improvements to the historical Clitheroe Market. We look forward to working in partnership with Ribble Valley project teams to deliver these improvements.
Anti-1
Anti-Terrorist Bollards project
Selected as the preferred supplier to install Anti-Terrorist Bollards outside of Burnley Football Club. The new bollards will protect matchday fans from potential incidents. This project is in conjunction with the Town 2 Turf project also undertaken by Groundwork Direct.
Lindsay-Park_10
Lindsay Park
Undertaken improvements to residential gardens and patios etc.
Image-1
Town 2 Turf
Improving the “corridor” from Burnley town centre to Turf Moor, home of Burnley Football Club. We were successfully selected following a tender process to complete the laying of paving element of the project and are pleased to be supporting the significant improvements this project will deliver. Working alongside Lancashire County council to deliver the transformation.
Marsden-11-2
Marsden
New driveway and gates installed to private property in Marsden.
thumb_P1020161_1024
Netherwood Road Bridge
A new bridge linking Netherwood Road with the Brun Valley Forest Park has been completed providing a new route that passes through woodlands and meadows on the southside of the river.